Amendment to specifications of European imported flat steel price assessments: pricing notice

Fastmarkets has amended the specifications for its CFR Europe flat steel import price assessments to better reflect the most typical sizes of spot market transactions.

Following the consultation, which ended on Wednesday December 24, Fastmarkets amended the specifications for its CFR Europe flat steel import price assessments on Wednesday December 31.

Based on feedback from market participants, Fastmarkets has amended the tonnage specification to a minimum of 500 tonnes from 500-5,000 tonnes previously, recognizing that higher tonnages are often transacted in the physical market. 

Fastmarkets also clarifies that these assessments do not include EU Carbon Border Adjustment Mechanism (CBAM) costs. 

The changes are effective as of Wednesday December 31.

The new specifications are listed below with amendments in italic: 

MB-STE-0047 Steel hot-rolled coil import, cfr main port Southern Europe, €/tonne 
Quality: Width 1,200-1,300 mm, thickness 3-4 mm. Standard extras for dimensions excluded 
Quantity: Minimum 500 tonnes 
Location: CFR Southern Europe 
Timing: 8-12 weeks  
Unit: EUR/tonne  
Publication: Weekly. Wednesday, 2-3pm London time 
Notes: CBAM costs not included 

MB-STE-0046 Steel hot-rolled coil import, cfr main port Northern Europe, €/tonne
Quality: Width 1,200-1,300 mm, thickness 3-4 mm. Standard extras for dimensions excluded 
Quantity: Minimum 500 tonnes 
Location: CFR Northern Europe 
Timing: 8-12 weeks 
Unit: EUR/tonne 
Publication: Weekly. Wednesday, 2-3pm, London time 
Notes: CBAM costs not included 

MB-STE-0044Steel cold-rolled coil import, cfr main port Northern Europe, €/tonne 
Quality: Width 1,200-1,300 mm, thickness 1 mm. Standard extras for dimensions excluded 
Quantity: Minimum 500 tonnes 
Location: CFR Northern Europe 
Timing: 8-12 weeks 
Unit: EUR/tonne 
Publication: Weekly, Wednesday, 2-3pm, London time 
Notes: CBAM costs not included 

MB-STE-0045
 Steel cold-rolled coil import, cfr main port Southern Europe, €/tonne
Quality: Width 1,200-1,300mm, thickness 1mm. Standard extras for dimensions excluded 
Quantity: Minimum 500 tonnes 
Location: CFR Southern Europe 
Timing: 8-12 weeks 
Unit: EUR/tonne 
Publication: Weekly. Wednesday 2-3pm London time 
Notes: CBAM costs not included 

MB-STE-0091 Steel hot-dipped galvanized coil import, cfr main port Northern Europe, €/tonne 
Quality: Standard 1-2 mm thickness. Includes Z120 coating 
Quantity: Minimum 500 tonnes 
Location: CFR Northern Europe 
Timing: 8-12 weeks  
Unit: EUR/tonne  
Publication: Weekly, Wednesday, 2-3pm, London time 
Notes: CBAM costs not included 

MB-STE-0048
 Steel hot-dipped galvanized coil import, cfr main port Southern Europe, €/tonne 
Quality: Standard 1-2 mm thickness. Includes Z120 coating 
Quantity: Minimum 500 tonnes 
Location: CFR Southern Europe 
Timing: 8-12 weeks 
Unit: EUR/tonne 
Publication: Weekly. Wednesday 2-3pm London time 
Notes: CBAM costs not included 

These prices are a part of the Fastmarkets steel package. 

To provide feedback on these prices or if you would like to provide price information by becoming a data submitter to any of the prices, please contact pricing@fastmarkets.com and steel@fastmarkets.com. Please add the subject heading “re: European import flat steel prices.” 

Please indicate if comments are confidential. Fastmarkets will consider all comments received and will make comments not marked as confidential available upon request. 

To see all Fastmarkets pricing methodology and specification documents, go to the Fastmarkets methodology page

What to read next
An incorrect EUR/USD exchange rate, used to convert the cost of inputs priced in euros to US dollars, caused the prices to be calculated incorrectly. This has now been rectified. The following prices were affected: AG-SAF-0004 Sustainable aviation fuel (SAF max), base cost, exw Netherlands, $/tonnePublished incorrectly as: $2,995 per tonneCorrected to: $1,996 per tonne […]
The publication of Fastmarkets’ European aluminium billet premiums assessments for Friday February 6 was delayed because of a procedural error. Fastmarkets’ pricing database has been updated.
Fastmarkets has corrected its MB-GD-0001 Gadolinium oxide 99.99%-99.999% fob China, $/kg price, which was published incorrectly.
Fastmarkets launches MB-STE-0951 Steel hot-rolled coil index, fob mill Canada on Thursday February 5.
The consultation, which is open until Friday March 6, seeks to ensure that our audited methodologies and price specifications continue to reflect the physical markets for steelmaking raw materials, in compliance with the International Organization of Securities Commissions (IOSCO) principles for Price Reporting Agencies (PRAs). This includes all elements of our pricing process, our price […]
The price subject to this annual review is Fastmarkets’ MB-STE-0141 steel billet import, cfr Manila, $/tonne.​This consultation, which is open until Friday March 6, seeks to ensure that our methodologies continue to reflect the physical CFR Manila steel billet market, in compliance with the International Organization of Securities Commission (IOSCO) principles for price reporting agencies (PRAs). This […]