Amendment to the frequency of Rotterdam, Busan molybdenum prices

After a consultation period, Fastmarkets has amended the pricing frequency of its assessments for MB-FEO-0001 Ferro-molybdenum 65% Mo min, in-whs Rotterdam; MB-FEO-0003 Molybdenum drummed molybdic oxide 57% Mo min, in-whs Rotterdam; and MB-FEO-0004 Molybdenum MB drummed molybdic oxide Mo, in-whs Busan to daily, from twice weekly.

The change will allow Fastmarkets to better reflect the dynamics in these markets, in light of consistently high liquidity and volatility.

Fastmarkets did not receive any direct responses to this consultation, but has previously received extensive feedback from the ferro-alloys market supporting this change.

Effective Monday July 1, these prices will be published daily. Previously, they were published on Wednesdays and Fridays.

All other specifications of these prices remain unchanged.

The new specifications are as follows:

MB-FEO-0001 Ferro-molybdenum 65% Mo min, in-whs Rotterdam, $/kg Mo
Quality: Lump 5-50mm, 90% min, Mo 65% min, Si 1.50% max, Cu 0.50% max, C 0.10% max, S 0.10% max, P 0.05% max. All other elements should be each 0.10% max, with the exception of Fe
Quantity: Min 10 tonnes (+/- 2%)
Location: In-whs Rotterdam Unit: USD per kg Mo Payment terms:
Cash; other payment terms normalized
Publication: Daily 2-3pm London time

MB-FEU-0003 Molybdenum drummed molybdic oxide 57% Mo min, in-whs Rotterdam, $/lb Mo
Quality: Sandy powder (0-4mm). Mo 57% min, Cu 0.5% max, S 0.1% max, P 0.05% max, Pb 0.05% max, C 0.1% max. All other elements should each be 0.10% max, with the exception of Si, which should be 6% max.
Quantity: Min 10 tonnes (+/- 2%)
Location: In-whs Rotterdam Unit: USD per lb Mo
Payment terms: Cash; other terms normalized
Publication: Daily, 2-3pm London time

MB-FEU-0004 Drummed molybdic oxide, in-warehouse Busan $/lb Mo
Quality: Sandy powder (0-4 mm). Mo 57% min, Cu 0.5% max, S 0.1% max, P 0.05% max, Pb 0.05% max, C 0.1% max. All other elements should each be 0.10% max, with the exception of Si, which should be 6% max.
Quantity: 10 tonnes (+/- 2%)
Location: In-whs Busan Timing: Spot Unit: USD per lb Mo
Payment terms: Cash; other terms normalized
Publication: Daily, 2-3pm London time

These prices are part of the Fastmarkets ores and alloys package.

To provide feedback on these prices or if you would like to provide price information by becoming a data submitter to these prices, please contact Claire Patel-Campbell by email at: pricing@fastmarkets.com. Please add the subject heading “FAO: Claire Patel-Campbell re: Rotterdam and Busan molybdenum prices.”

Please indicate if comments are confidential. Fastmarkets will consider all comments received and will make comments not marked as confidential available upon request.

To see all Fastmarkets pricing methodology and specification documents, go to https://www.fastmarkets.com/methodology

What to read next
Fastmarkets invited feedback from the industry on the pricing methodology for Asia recovered paper and Asia packaging paper and board via an open consultation process between May 5 and June 2, 2026.
Fastmarkets invited feedback from the industry on the pricing methodology for PIX Forest Biomass Finland price indices via an open consultation process between May 13 and June 10, 2026. This consultation was done as part of our published annual methodology review process.
Fastmarkets has corrected its FP-LBR-1245 Kiln-dried eastern spruce-pine-fir stud 2x4 9-ft PET delivered Boston price, which was published incorrectly on Tuesday June 9.
Fastmarkets has corrected the rationale for its MB-MNO-0002 manganese ore semi carbonate index, 36.5% Mn, fob Port Elizabeth, which was published incorrectly on Friday June 5 due to incorrect source data.
Fastmarkets invited feedback from the industry on the pricing methodology for PIX Packaging Europe indices via an open consultation process between May 7 and June 8, 2026. This consultation was done as part of our published annual methodology review process.
The MB-MNO-0003 Manganese ore semi carbonate index, 36.5% Mn, cif Tianjin, $ per dmtu was published in error as $4.75 per dry metric tonne unit. It has been corrected to $4.74 per dmtu. The rationale for the same index on the same date was also updated to reflect this change. It erroneously stated that “Fastmarkets’ manganese ore semi-carbonate […]