Glencore cuts 2015 capex ceiling to $6bn

Glencore has cut its maximum industrial capex for 2015 to $6 billion, compared with the $6.5-6.8 billion announced in February.

Glencore has cut its maximum industrial capex for 2015 to $6 billion, compared with the $6.5-6.8 billion announced in February.

The miner’s industrial capex was $3 billion in the first six months of the year, the company said in its production report for the period.

In production guidance included in the report, Glencore set a full-year 2015 ferro-chrome production target of 1.45-1.5 million tonnes, up from 1.3 million tonnes in 2014.

Glencore’s ferro-chrome production increased 16% year-on-year in the first half of 2015 on greater output from its Lion 2 smelter.

Full-year 2015 zinc production is expected to increase to 1.52-1.57 million tonnes, up from 1.39 million tonnes in 2014.

Copper production guidance has been set at 1.5-1.55 million tonnes in 2015, roughly flat on the 1.546 million tonnes in 2014. Copper production fell 3% in the first half of 2015 as a result of lower-grade material and maintenance.

Lead production is expected to increase to 335,000-360,000 tonnes in 2015. In 2014, about 308,000 tonnes of lead was produced.

Nickel production guidance has been set at 98,000-108,000 tonnes for 2015. The company produced about 101,000 tonnes of nickel in 2014.

The table below shows the midpoint of each production guidance range against full-year production in 2014.

Glencore’s production guidance for full-year 2015, as of August 2015 

  2014                 production
Tonnes (000)      
High Low Midpoint % change
Copper 1,546 1,500 1,550 1,525 -1.36%
Zinc 1,387 1,520 1,570 1,545 11.39%
Lead 308 335 360 347.5 12.83%
Nickel 101 98 108 103 1.98%
Ferro-chrome 1,295 1,450 1,500 1,475 13.90%

Charlotte Radford 
charlotte.radford@metalbulletin.com
Twitter: @CRadford_MB 

What to read next
European automotive procurement faces growing complexity due to regional cost volatility and policy-driven supply chains reshaping material pricing and sourcing strategies. This demands granular, region-specific market intelligence for precise cost modeling and strategic decision-making.
The assessment, which currently follows the UK holiday calendar, will follow the Singapore holiday calendar after the proposed change. There will be no change to the publication timing, and the assessment will continue to be published weekly on Wednesdays, at 7pm Singapore time. The purpose of the adjustment is to align the timing to the […]
The publication of Fastmarkets’ aluminium scrap price assessments for the Mexico market was delayed on June 1 due to a technical error in the publication process.
The following price was affected:MB-STE-0909 Steel reinforcing bar (rebar), domestic, delivered Saudi Arabia, riyals/tonne The price was published with a delay of 42 minutes on June 1. This price is part of the Fastmarkets steel package. For more information, or to provide feedback on the delayed publication of this price, or if you would like […]
JX Advanced Metals, Mitsui Kinzoku, Marubeni and Mitsubishi Materials(MMC) inked a deal to integrate MMC's copper concentrate procurement and related products sales business into Pan Pacific Copper (PPC), marking a significant consolidation of Japan's copper concentrate purchasing sector amid persistent pressure from weak treatment and refining charges (TC/RCs).
Fastmarkets has deleted the assessments on May 22 of the aluminium primary foundry alloy silicon 7 ingot premiums, ddp Germany and ddp Eastern Europe, that were published in error due to a procedural lapse.