ERG suspends copper, cobalt production at Chambishi

Production of copper and cobalt has been suspended at the Chambishi refinery in Zambia due to constrained supply of imported feedstock.

The suspension follows the introduction of a new 5% duty on cobalt and copper concentrates imported into Zambia that came into effect this year. The Chambishi refinery processes feed from ERG’s Boss Mining and Frontier Mine in the Democratic Republic of Congo.

“In light of recent developments related to the import of feedstock into the Republic of Zambia and following discussions with relevant labor union representatives, we have temporarily suspended operations at Chambishi Metals with 351 workers placed on paid leave,” a spokesman for ERG Africa confirmed to Fastmarkets.

“We are exploring all options in order to resume operations as soon as possible,” he added.

Copper producers in Zambia have been considering production cuts as a result of the new import duty. Konkola Copper Mines cut its operations in Ngchanga copper smelter last month amid lower availability of concentrates, for example, Fastmarkets reported at the time.

Chambishi has the capacity to produce 55,000 tonnes per year of grade A copper cathodes and 6,800 tpy cobalt in the form of broken cathode, though output of the latter has been declining in recent years due to declining output from Boss Mining. Chambishi produced about 2,300 tonnes of cobalt in 2018.

Fastmarkets’ benchmark standard-grade cobalt price, which takes account of broken cathodes produced at Chambishi, fell to $17.30-19.45 per lb, in-warehouse Rotterdam, on Wednesday February 13 from $25.75-27.25 per lb on January 4.

Metal prices have slumped since the beginning of the year under pressure from good availability of cut cathode and oversupply at other points along the cobalt supply chain.

What to read next
The influential annual treatment and refining charge (TC/RC) benchmark that sets the price that smelters charge miners to process their copper concentrate could be at risk, according to multiple market sources, although most believe the system, or elements of it, will remain
Fastmarkets' initial low-carbon premium for nickel briquettes captured existing regional price differences, with growing awareness and legislative incentives indicating there is potential for a strong market to emerge
The Chilean government is pushing ahead with plans for a new copper smelter despite the global smelting crisis, Chile’s minister of mining, Aurora Williams told Fastmarkets, adding that the state will also play a key role in developing the country’s premium lithium assets
Just under two weeks ago, the chair of BHP made a phone call to his counterpart at mining peer Anglo American and set in motion a flurry of activity designed to create the largest copper producer in the world
Brazilian aluminium supply coming from Companhia Brasileira de Alumínio (CBA) is said to have tightened, helping to boost the P1020A ingot premium, market participants told Fastmarkets in the two weeks to Wednesday April 24
In anticipation of a tight market, copper concentrate traders have locked in 2025 volumes at notably low treatment charges, with deals being placed well below the long-term industry benchmarks