Boliden revises annual copper tonnages on production problems

Production problems at Boliden’s Aitik copper mine will result in lower volumes and recoveries in the second quarter.

Production problems at Boliden’s Aitik copper mine will result in lower volumes and recoveries in the second quarter.

Second-quarter production at the Swedish miner’s Aitik project will be lower than expected as a result of an ore mix that is causing low recoveries and process disturbances in the concentrator, the company said on Tuesday June 9.

Copper recovery is expected to remain at the same level as in the first quarter, while milled volumes are expected to be negatively affected by around one million tonnes during the second quarter.

The production plan for milled tonnage for the whole year of 2015 has been adjusted down to 39 million tonnes, the company said.

James Heywood
jheywood@metalbulletin.com
Twitter: @jamesheywood_MB

What to read next
Brazilian aluminium supply coming from Companhia Brasileira de Alumínio (CBA) is said to have tightened, helping to boost the P1020A ingot premium, market participants told Fastmarkets in the two weeks to Wednesday April 24
In anticipation of a tight market, copper concentrate traders have locked in 2025 volumes at notably low treatment charges, with deals being placed well below the long-term industry benchmarks
This move aligns with global demands for sustainability in the mining sector and sets Nexa on a path toward achieving net zero emissions by 2050
Fastmarkets has corrected the pricing rationale for MB-AL-0302 aluminium 6063 extrusion billet premium, ddp North Germany (Ruhr region), $/tonne, which was published incorrectly on Friday April 19. No prices were corrected.
The low-carbon aluminium differential in the US made its first move on Friday April 5 since Fastmarkets launched it five months ago.
Brazil's aluminium industry is further enhancing its sustainability by boosting renewable energy use and recycling, while mitigating risk from high-carbon imports