Codelco to cut operations amid Chilean state of emergency

Chilean copper miner Codelco will reduce its operations to comply with a state of emergency announced by the government in an attempt to curb the spread of the novel coronavirus (2019-nCoV), the state-owned company said on Wednesday March 18.

Codelco, which is the world’s largest copper producer, said it would maintain “operational continuity” for a 15-day period from March 19 across all its units to reduce the number of workers required on site, in accordance with government-imposed restrictions on movement.

“All of our workers commute day by day, using different modes of transportation, and are exposed to sources of infection,” Codelco said. “The mining industry must adhere to the political and sanitary actions taken [by the government].”

The company added that it will monitor the situation daily and take necessary measures to ensure its facilities are able to resume normal operations as soon as is allowed.

Chile and Peru have both declared a state of emergency and are restricting travel among their citizens to try and contain the spread of the coronavirus. Some Peruvian mines have already trimmed output or were put under care and maintenance earlier this week.

Codelco produced 1.71 million tonnes in copper content in 2019, down by 5.6% from 1.81 million tonnes a year before. It accounted for 30% of Chile’s total output during that period.

Also on Wednesday, union workers at BHP’s Escondida copper mine, the world’s largest, urged the mine’s management to implement stricter measures to prevent the spread of the coronavirus. The union said it would resort to federal authorities or legal measures if the request was not granted.

“The Chilean government has guaranteed foreign trade will continue as normal and Chilean ports are working as usual,” one Chile-based miner source told Fastmarkets. “The workers, on the other hand, could decide to stop working [through union decisions], which would complicate the scenario.”

“I think it’s a tough choice. On one hand, the coronavirus outbreak is a serious matter. On the other, mining companies don’t want to cut production as it would increase costs, especially at today’s prices,” the miner source added.

Potential supply shortages come at a time when treatment and refining charges (TC/RCs) were at a one-year high amid reduced demand from Chinese smelters – also a result of the coronavirus pandemic.

Fastmarkets’ copper concentrates TC index, cif Asia Pacific was at $68 per tonne on March 13, up from $66.40 per tonne a week earlier.

Felipe Peroni in São Paulo contributed to this report.

What to read next
Jeddah in Saudi Arabia and Port of Sohar in Oman are becoming tactical workarounds for base metal exports blocked by the Strait of Hormuz closure, with cargo transiting via land-bridge to other Gulf states, such as Bahrain and the United Arab Emirates – though capacity constraints and elevated logistics costs limit availability, sources with direct visibility of Gulf supply chains told Fastmarkets.
The Mexican aluminium market might be strongly affected by the closure of the Strait of Hormuz, with supply constraints and consequently higher premiums, market participants told Fastmarkets on Tuesday March 10.
This consultation, which is open until April 8, 2026, seeks to ensure that our methodologies continue to reflect the physical market, in compliance with the International Organization of Securities Commissions (IOSCO) principles for Price Reporting Agencies (PRAs). This includes all elements of our pricing process, our price specifications and publication frequency. The price under review […]
The publication of Fastmarkets’ assessments for copper grade A cathode warrant premiums and aluminium P1020A warrant premiums was delayed on Wednesday March 11 because of a procedural lapse. Fastmarkets’ pricing database has been updated.
Lundin Mining and BHP published a preliminary economic assessment on February 16 for their Vicuña joint venture, projecting average annual copper production of 395,000 tonnes over the first 25 years of operation as Argentina’s copper concentrate pipeline continues to build. PSJ Cobre Mendocino separately confirmed on February 14 that its feasibility study was under way.
Chinese lead smelters turned more bearish on the procurement of raw materials in the week to Friday February 13, amid heightened price volatility in silver, which is often contained in lead ores as an important by-product and contributor to smelter profits, sources told Fastmarkets.