Clarification of delivery timing for minor metals specifications

After a consultation period between Monday June 26 and Friday August 18, Fastmarkets has added an explanation clarifying prompt release timing to within ten calendar days in its pricing methodology for the prices below:

MB-BI-0001 Bismuth 99.99% Bi min, in-whs Rotterdam, $/lb
MB-CD-0001 Cadmium 99.95% min, cif global ports, cents/lb
MB-CD-0002 Cadmium 99.99% min, cif global ports, cents/lb
MB-IN-0002 Indium 99.99%, in-whs Rotterdam, $/kg
MB-SE-0002 Selenium 99.5% Se min, in-whs Rotterdam, $/lb
MB-TE-0001 Tellurium 99.9-99.99% Te min, in-whs Rotterdam, $/kg

Market feedback received during the consultation was in support of Fastmarkets implementing this change for the metals listed above.

This consultation sought to ensure that Fastmarkets’ methodologies continue to reflect the physical market under assessment.

The updated specification of the price are as follows:

MB-BI-0001 Bismuth 99.99% Bi min, in-whs Rotterdam, $/lb
Quality: Ingot. Bi 99.99%, no other elements specified
Quantity: Min 1 tonne
Location: Rotterdam
Timing: Prompt release, within ten calendar days
Unit: USD/lb
Payment terms: Cash, other payment terms normalized
Publication: Twice weekly. Wednesday and Friday 2-3pm London time
Notes: Original producer packaging

MB-CD-0001 Cadmium 99.95% min, cif global ports, cents/lb 
Quality: Sticks or ingots. Cd 99.95%, no other elements specified
Quantity: Min 10 tonnes
Location: CIF global port basis
Timing: Prompt release, within ten calendar days
Unit: US cents per lb
Payment terms: Cash, other payment terms normalized
Publication: Twice weekly. Wednesday and Friday 2-3pm London

MB-CD-0002 Cadmium 99.99% min, cif global ports, cents/lb 
Quality: Sticks or ingots. Cd 99.99%, no other elements specified
Quantity Min 10 tonnes
Location: cif global port basis
Timing: Prompt release, within ten calendar days
Unit: US cents per lb
Payment terms: Cash, other terms normalized
Publication: Twice weekly. Wednesday and Friday 2-3pm London time

MB-IN-0002 Indium 99.99%, in-whs Rotterdam, $/kg 
Quality: In: 99.99%, no other elements specified. Ingots, usually between 0.5kg and 3.5 kg; also 10 kg ingots
Quantity: Min 100kg
Location: In-whs Rotterdam
Timing: Prompt release, within ten calendar days
Unit: USD/kg
Payment terms: Cash, other terms normalized
Publication: Twice-weekly. Wednesday and Friday 2-3pm London time
Notes: Original producer wooden cases

MB-SE-0002 Selenium 99.5% Se min, in-whs Rotterdam, $/lb 
Quality: Powder of minus 200 mesh or granules sizing 1-5 mm. Se 99.5% min, no other elements specified
Quantity: Min 250kg (+/-2%)
Location: In-whs Rotterdam
Timing: Prompt release, within ten calendar days
Unit: USD/lb
Payment terms: Cash, other terms normalized
Publication: Twice-weekly. Wednesday and Friday 2-3pm London time
Notes: Original producer packaging, normally 25kg net

MB-TE-0001 Tellurium 99.9-99.99% Te min, in-whs Rotterdam, $/kg 
Quality: Ingots, sticks or powder. Te 99.9- 99.99%, no other elements specified
Quantity: Min 100 kg (+/-2%)
Location: In-whs Rotterdam
Timing: Prompt release, within ten calendar days
Unit: USD/kg
Payment terms: Cash, other terms normalized
Publication: Twice-weekly. Wednesday and Friday between 2pm and 3pm London time
Notes: Original producer packaging

However, in light of the recent introduction of export controls from China and a lack of clarity as to how they will affect gallium, germanium metal and dioxide market dynamics, Fastmarkets continues to monitor the typical terms of trade in these markets and continue an informal consultation on this over coming weeks.

MB-GA-0001 Gallium 99.99% Ga min, in-whs Rotterdam, $/kg 
Quality: Ingot. Ga: 99.99% min, no other elements specified
Quantity: Min 100kg (+/- 2%)
Location: In-whs Rotterdam
Timing: Prompt release
Unit: USD/kg
Payment terms: Cash, other terms normalized
Publication: Twice weekly. Wednesday and Friday 2-3pm London time
Notes: Packed in plastic sleeves, original producer cases

MB-GER-0003 Germanium 99.999% Ge, in-whs Rotterdam, $/kg 
Quality: Min 100 kg (+/- 2%)
Quality: Ingot. Ge 99.999%, no other elements specified
Location: In-whs Rotterdam
Timing: Prompt release
Unit: USD/kg
Payment: Cash, other payment terms normalized
Publication: Twice-weekly. Wednesday and Friday between 2pm and 3pm London time
Notes: Packed in plastic sleeves, original producer cases

MB-GER-0001 Germanium dioxide, in-whs China, $/kg 
Quality: GeO2 99.99 % min, Ge 69 % approx. White powder
Quantity: Min 100 kg (+/- 2%)
Location: In-whs China
Timing: Prompt release
Unit: USD/kg
Payment terms: Cash, other payment terms normalized
Publication: Twice-weekly. Wednesday and Friday between 2pm and 3pm London time
Notes: Original producer cases, normally 25kg each

To provide feedback on this decision, or if you would like to provide price information by becoming a data submitter to minor metals prices. Please contact Sayaka Kurata and Solomon Cefai by email at pricing@fastmarkets.com. Please add the subject heading “FAO: Sayaka Kurata and Solomon Cefai, re: minor metals.”

To see all of Fastmarkets’ pricing methodology and specification documents, go to https://www.fastmarkets.com/methodology

What to read next
The publication of Fastmarkets’ European bulk alloys prices for Friday January 16 was delayed because of a reporter error. Fastmarkets’ pricing database has been updated.
The publication of Fastmarkets’ manganese ore seaborne indices for Friday January 16 was delayed because of a reporter error. Fastmarkets’ pricing database has been updated.
Fastmarkets has corrected its prices of recovered paper, corrugated grades, old corrugated containers, imports from Japan, cif Southeast Asia, $ per tonne, which were published incorrectly on Friday January 16 owing to a typographical error.
Fastmarkets has corrected its AG-SYB-0032 Soyoil CFR India $/mt price, which was published incorrectly for M2 and M3 on November 18, 21 and 25, for M1, M2, M3 and M4 on November 26, and for M1, M2 and M3 on November 27 and 28 and December 1 due to a procedural lapse. The corresponding actual prices were also published incorrectly as well.
This consultation, which is open until Friday February 13, seeks to ensure that our methodologies continue to reflect the physical metals recycling markets, in compliance with the International Organization of Securities Commission (IOSCO) principles for price reporting agencies (PRAs). This includes all elements of our pricing process, our price specifications and publication frequency. View the […]
The consultation, which is open until Friday February 13, seeks to ensure that our audited methodologies and price specifications continue to reflect the physical markets for steel scrap, in compliance with the International Organization of Securities Commissions (IOSCO) principles for Price Reporting Agencies (PRAs). This includes all elements of our pricing process, our price specifications […]